JSTI|JSTI's Design of Hollow High-Rise Pier Cap, Long-Span Steel-Structure Pier and Steel Deck Structure of Honghe Grand Bridge in Construction of Jianshui (Gejiu)-Yuanyang Expressway Passed Review

22-Jun-2018
    On June 15, 2018, the meeting for reviewing the special design of the hollow high-rise pier cap and the steel deck structure of the Honghe Grand Bridge involved in the construction of the Jianshui (Gejiu)-Yuanyang Expressway in Honghe Autonomous Prefecture, Yunnan Province and undertaken by JSTI Group was successfully held at the JSTI Nanjing Design Center. Member of the Chinese Academy of Engineering and Professor of Tsinghua University Nie Jianguo, Design Master Ma Tinglin of the China Railway Eryuan Engineering Group, and Design Master Ma Biao of the Shanghai Municipal Engineering Design Institute, as well as experts from such famous universities as Tsinghua University, Tongji University and Southeast University attended the meeting. Deputy Chief Engineer Chen Fan of the project client Powerchina Roadbridge Group presided over the meeting and other leaders of Powerchina Roadbridge Group including General Manager Yang Song of the Jianshui (Gejiu)-Yuanyang Expressway Project and Chief Engineer Ai Zubin, as well as leaders of JSTI Group, including Director Ji Yuehua (JSTI Vice President), Chief Engineer Wang Jiaqiang, Deputy Director Qian Bin of the Transportation Planning & Design Institute, attended the meeting. Cao Xueyong, Deputy Chief Engineer and Director of the Special Bridge Division of the Transportation Planning & Design Institute, made an achievement report.